Predict the Erosion. Protect the Asset.
Coupled solids and erosion modelling that pinpointed hotspots before they became failures.
Coupled solids and erosion modelling that pinpointed hotspots before they became failures.
A WCAC framework that brought two 400 MMscf/d wells online, and a project US$200M under budget.
Spotting a latent integrity threat hiding inside a routine performance shortfall.
How rigorous failure-mode analysis turned regulatory scrutiny into formal acceptance, and protected ageing subsea assets.
Probabilistic evidence that ageing wells can stay productive, at AUD$57M optimised intervention spend.
A bespoke hydraulic solution that kept gas flowing while intervention plans matured.
How transient interpretation under live commissioning kept a critical gas well intact.
Why the highest-value commissioning work happens at the lifecycle boundary, not during start-up itself.
NOPSEMA-approved framework now the operator's template for every future well.