Predict the Erosion. Protect the Asset.

Coupled solids and erosion modelling that pinpointed hotspots before they became failures.

Predict the Erosion. Protect the Asset.

Commissioning by Criteria, Not Instinct

A WCAC framework that brought two 400 MMscf/d wells online, and a project US$200M under budget.

Commissioning by Criteria, Not Instinct

A US$100M Re-Drill, Avoided

Spotting a latent integrity threat hiding inside a routine performance shortfall.

A US$100M Re-Drill, Avoided

Defending the Status Quo

How rigorous failure-mode analysis turned regulatory scrutiny into formal acceptance, and protected ageing subsea assets.

Defending the Status Quo

Hundreds of Millions in Reserves, Saved

Probabilistic evidence that ageing wells can stay productive, at AUD$57M optimised intervention spend.

Hundreds of Millions in Reserves, Saved

Twelve Months of Production, Engineered

A bespoke hydraulic solution that kept gas flowing while intervention plans matured.

Twelve Months of Production, Engineered

Reading the Well, Not the Meter

How transient interpretation under live commissioning kept a critical gas well intact.

Reading the Well, Not the Meter

The Invisible Cost of a Sloppy Handover

Why the highest-value commissioning work happens at the lifecycle boundary, not during start-up itself.

The Invisible Cost of a Sloppy Handover

A New Standard for WOMPs

NOPSEMA-approved framework now the operator's template for every future well.

A New Standard for WOMPs